Case Studies: Generation Water Company Limited
For photos and more details about each case study please go to the links listed as the "public information sources".
Case 1 of 1: Turnkey production plant at JW Marriott Phuket Resort and Spa, Thailand
Location: JW Marriott Phuket Resort and Spa, Phuket, Thailand
Installation completion date: 2018
System specifications:
- Type, model: Mechanical dehumidifier
- 2,500 L/day (approximately)
- Energy cost of water: 0.33 kWh/L
- Minimum operational RH: 35%
- Minerals are added to the water-from-air
- Bottled in 500 mL glass bottles
Challenges met:
- Reliable supply of bottled water to a large resort hotel complex
Other interesting information:
- Bottles are distributed to 445 guestrooms and also to meeting rooms
Public information sources:
- https://www.generationwater.com/turnkey-solution [accessed 2019-10-16]
- https://www.generationwater.com/faq [accessed 2019-10-16]